OPERATION
22
Floorboard Installation
NOTE: The floorboards must be installed into the boat before the
boat is inflated.
NOTE: Each H channel should be installed with the larger flat side
facing up. Assemble floorboards with the printed identifying
number facing up.
Four board models
a - H channel ‑ Short
b - Side joiner
c - H channel ‑ Long
Commentaires sur ces manuels